#WorksiteWednesday at the AeroTEC Hangar 2
Lydig Construction is busy at the AeroTEC Hangar 2 project in Moses Lake. This hangar was designed specifically to fit the 747 shown. The first slab pour last week included 115 loads of concrete delivered and placed, and that’s only one-third of the entire hangar pour.