In the Press: Learn about the new biotech startup currently developing in the West Plains – Selkirk Pharma. Their state-of-the-art facility near the Spokane Airport will manufacture injectable drugs like vaccines and chemotherapy drugs. When they reach full utilization of their facility, will employ over 300 people. Bernardo Wills Architects provided architecture, interior, and landscape architecture for this highly technical project and Bouten Construction is the contractor.

#TransformationTuesday – Check out these progress photos from March 2021, and photos from the site last week at Selkirk Pharma.

In 1999, we worked with Fairchild Air Force Base to design their new Education Center and Library.

Check out the latest from the Selkirk Pharma jobsite in Airway Heights, WA.
Congratulations to Bouten Construction and Selkirk Pharma for the topping out of the Selkirk Pharma Manufacturing Facility in Airway Heights. We are honored to be a part of this project and can’t wait to see the positive impact your facility will have on our area.

xotic Metals is very happy with the overall results of this new addition to their campus and plans on moving towards full building utilization in 2021.

Lydig Construction is busy at the AeroTEC Hangar 2 project in Moses Lake. This hangar was designed specifically to fit the 747 shown.
The Exotic Metals Forming Company Expansion has been completed by Walker Construction in Airway Heights. Check out the exterior – an interior update to come!